- Nx 22.7 monorepo (pnpm 11.1, TypeScript 5.9, Node 24) - apps/api: NestJS 11 (CJS conforme CODING-RULES.md PGD-DB-004) - apps/web: React 19 + Vite 8 (ESM) - libs/shared/api-interface: Zod contract base - Docker Compose dev: Postgres 18, Valkey 8, MinIO, Mailpit - WDS artifacts: - design-artifacts/A-Product-Brief/ (5 docs canônicos + 16 dialogs) - design-artifacts/B-Trigger-Map/ (hub + 4 personas + feature impact) - Stack canon: STACK.md v2.2 + CODING-RULES.md v2.0 + brand.md - AGENTS.md + README.md como entrada para devs/agentes Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
226 lines
7.5 KiB
Markdown
226 lines
7.5 KiB
Markdown
---
|
|
name: 'step-02-structure'
|
|
description: 'Configure project settings create folder structure and generate project outline'
|
|
|
|
# File References
|
|
workflowFile: '../workflow.md'
|
|
activityWorkflowFile: '../workflow.md'
|
|
---
|
|
|
|
# Step 2: Project Configuration & Structure
|
|
|
|
## STEP GOAL:
|
|
|
|
Configure all project settings (name, complexity, tech stack, component library, brief level, strategic analysis, working relationship), create the folder structure, and generate the project outline.
|
|
|
|
## MANDATORY EXECUTION RULES (READ FIRST):
|
|
|
|
### Universal Rules:
|
|
|
|
- 🛑 NEVER generate content without user input
|
|
- 📖 CRITICAL: Read the complete step file before taking any action
|
|
- 🔄 CRITICAL: When loading next step with 'C', ensure entire file is read
|
|
- 📋 YOU ARE A FACILITATOR, not a content generator
|
|
- ✅ YOU MUST ALWAYS SPEAK OUTPUT in your Agent communication style with the config `{communication_language}`
|
|
|
|
### Role Reinforcement:
|
|
|
|
- ✅ You are the Project Setup facilitator, configuring the WDS project
|
|
- ✅ If you already have been given a name, communication_style and persona, continue to use those while playing this new role
|
|
- ✅ We engage in collaborative dialogue, not command-response
|
|
- ✅ You bring WDS methodology expertise, user brings their project knowledge
|
|
- ✅ Maintain a helpful and efficient tone throughout
|
|
|
|
### Step-Specific Rules:
|
|
|
|
- 🎯 Focus only on gathering project configuration and creating structure
|
|
- 🚫 FORBIDDEN to skip configuration questions or assume answers
|
|
- 💬 Approach: Ask each configuration question, respect user choices
|
|
- 📋 Configuration determines the entire project workflow path
|
|
|
|
## EXECUTION PROTOCOLS:
|
|
|
|
- 🎯 Gather all configuration settings and create project structure
|
|
- 💾 Save project outline to `{{root_folder}}/_progress/wds-project-outline.yaml`
|
|
- 📖 Follow the configuration sequence exactly
|
|
- 🚫 Do not skip questions or assume defaults without offering choice
|
|
|
|
## CONTEXT BOUNDARIES:
|
|
|
|
- Available context: Project type (greenfield/brownfield) from step 0.1
|
|
- Focus: Project configuration and structure creation
|
|
- Limits: Configuration only - do not begin Phase 1 work
|
|
- Dependencies: step-01-welcome must be completed
|
|
|
|
## Sequence of Instructions (Do not deviate, skip, or optimize)
|
|
|
|
### 1. Project Name
|
|
|
|
**What is your project name?**
|
|
|
|
### 2. What Are You Building?
|
|
|
|
**What type of product is this?**
|
|
|
|
[A] **Landing Page** - Single page, marketing focused -> Simplified workflow, minimal phases
|
|
[B] **Website** - Multiple pages, content focused -> Standard workflow, most phases
|
|
[C] **Web Application** - Complex features, user interactions -> Full workflow, all phases
|
|
[D] **Mobile App** - iOS/Android application -> Full workflow + platform considerations
|
|
|
|
Store as `product_complexity`: A=simple, B=standard, C=complex, D=complex+mobile
|
|
|
|
### 3. Tech Stack (Optional)
|
|
|
|
**Tech stack?** [A] React/Next [B] Vue/Nuxt [C] WordPress [D] HTML [E] Other [F] Skip
|
|
|
|
Store as `tech_stack` (or null if F)
|
|
|
|
### 4. Component Library (Optional)
|
|
|
|
**Component library?**
|
|
|
|
[A] **shadcn/ui** -> Skip Phase 5
|
|
[B] **Tailwind only** -> Phase 5 optional
|
|
[C] **Material UI** -> Skip Phase 5
|
|
[D] **Custom** -> Phase 5 recommended
|
|
[E] **Skip** - Decide later
|
|
|
|
Store as `component_library`. If A/C -> `skip_design_system: true`
|
|
|
|
### 5. Root Folder Name
|
|
|
|
**Where should design process files live?**
|
|
|
|
[A] **design-process** (Recommended)
|
|
[B] **docs**
|
|
[C] **Custom name**
|
|
|
|
Store as `root_folder`: A=design-process, B=docs, C=custom
|
|
|
|
### 6. Existing Materials (Optional Context)
|
|
|
|
**Do you have any existing materials for this project?**
|
|
|
|
[A] **Yes** - I have some materials to share
|
|
[B] **No** - Starting fresh
|
|
|
|
If Yes: Review materials, store in outline under `existing_materials`
|
|
If No: Store `existing_materials.has_materials: false`
|
|
|
|
### 7. Brief Level
|
|
|
|
**Greenfield**: Always use Complete Brief (`brief_level: complete`)
|
|
|
|
**Brownfield**: Ask how thorough the Project Brief should be:
|
|
[A] **Complete** - Full strategic documentation
|
|
[B] **Simplified** (Recommended) - Document what exists + what to change
|
|
|
|
Store as `brief_level`: complete | simplified
|
|
|
|
### 8. Strategic Analysis Level (Greenfield only)
|
|
|
|
**How deep should the user/market analysis go?** (Only ask if greenfield AND not simple)
|
|
|
|
[A] **Full Trigger Map** (Recommended for complex) -> Phase 2 enabled
|
|
[B] **Simplified** -> Strategic context in Phase 1, skip Phase 2
|
|
[C] **Skip** (Not recommended) -> Skip Phase 2
|
|
|
|
Store as `strategic_analysis`: full | simplified | skip
|
|
|
|
### 9. Working Relationship Context
|
|
|
|
**What are the stakes of this project?**
|
|
|
|
[A] **Personal/Hobby** -> Encouragement-focused, minimal documentation
|
|
[B] **Small Business Investment** -> Balanced rationale, professional
|
|
[C] **Departmental/Organizational** -> Comprehensive justification, evidence-based
|
|
[D] **Enterprise/High Stakes** -> Rigorous documentation, proof for every point
|
|
|
|
**How involved do you want to be?**
|
|
[A] Highly collaborative [B] Balanced [C] Autonomous execution
|
|
|
|
**What is your role?**
|
|
[A] Client/Stakeholder [B] Product Owner [C] Design Partner [D] Project Manager [E] Other
|
|
|
|
**How should I present recommendations?**
|
|
[A] Suggest options [B] Recommend with rationale [C] Direct guidance
|
|
|
|
If stakes C/D: Ask about stakeholders and political sensitivities.
|
|
|
|
Store all as `project_context` and `working_relationship` in outline.
|
|
|
|
### 10. Create Structure & Outline
|
|
|
|
**Check existing:** Look for `{{root_folder}}/` and outline file
|
|
**If exists:** Ask to keep or reset
|
|
|
|
**Create folder structure:**
|
|
1. Create root folder: `{{root_folder}}/`
|
|
2. Create progress folder: `{{root_folder}}/_progress/`
|
|
3. Create agent experiences folder: `{{root_folder}}/_progress/agent-experiences/`
|
|
4. Create phase folders (greenfield vs brownfield)
|
|
5. Create D-Design-System subfolders
|
|
6. Install folder guide files from templates
|
|
|
|
**Generate `{{root_folder}}/_progress/wds-project-outline.yaml`** with all configuration values.
|
|
|
|
**Fill in `00-design-log.md`** with initial Phase 0 entry.
|
|
|
|
### 11. Summary & Next Steps
|
|
|
|
**Project configured!** Display summary table of all settings.
|
|
|
|
**Greenfield routing:**
|
|
[A] Start Phase 1 now
|
|
[B] Hand off to Saga (specialist)
|
|
|
|
**Brownfield routing:**
|
|
[A] Create Limited Brief now
|
|
[B] Scan my codebase first
|
|
[C] I know what to improve - go
|
|
|
|
### 12. Routing
|
|
|
|
**Greenfield:** [A] -> Phase 1 workflow, [B] -> Hand off to Saga
|
|
**Brownfield:** [A] -> Limited Brief, [B] -> Scan codebase, [C] -> Phase 8
|
|
|
|
### 13. Present MENU OPTIONS
|
|
|
|
Display: "**Select an Option:** [M] Return to Activity Menu"
|
|
|
|
#### Menu Handling Logic:
|
|
- IF M: Return to {workflowFile} or {activityWorkflowFile}
|
|
- IF Any other comments or queries: help user respond then [Redisplay Menu Options]
|
|
|
|
#### EXECUTION RULES:
|
|
- ALWAYS halt and wait for user input after presenting menu
|
|
- User can chat or ask questions - always respond and then redisplay menu options
|
|
|
|
## CRITICAL STEP COMPLETION NOTE
|
|
|
|
ONLY WHEN the project is fully configured and structure is created will you present the return to Activity Menu option.
|
|
|
|
---
|
|
|
|
## 🚨 SYSTEM SUCCESS/FAILURE METRICS
|
|
|
|
### ✅ SUCCESS:
|
|
- All configuration questions are answered
|
|
- Project outline YAML is generated correctly
|
|
- Folder structure is created
|
|
- Correct routing to next phase based on project type and configuration
|
|
- User understands what comes next
|
|
|
|
### ❌ SYSTEM FAILURE:
|
|
- Skipping configuration questions
|
|
- Assuming defaults without offering choice
|
|
- Not creating folder structure
|
|
- Not generating project outline YAML
|
|
- Routing to wrong phase
|
|
|
|
**Master Rule:** Skipping steps, optimizing sequences, or not following exact instructions is FORBIDDEN and constitutes SYSTEM FAILURE.
|
|
|
|
---
|
|
|
|
_Phase 0: Project Setup - Step 02: Configuration & Structure_
|